0.19 miles
|
21710 Charles View
|
|
0.27 miles
|
Amazon 45259 Severn
|
|
0.30 miles
|
Amazon 45305 Severn
|
|
0.32 miles
|
Amazon IAD32
|
|
0.42 miles
|
Amazon IAD10
|
|
0.49 miles
|
CyrusOne Northern Virginia Sterling V
|
|
0.61 miles
|
PowerHouse ABX1
|
|
0.64 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
0.65 miles
|
Equinix DC15
|
|
0.66 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
0.75 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
0.76 miles
|
Amazon 44854 Interconnection
|
|
0.78 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
0.80 miles
|
Amazon 44858 Interconnection Plaza
|
|
0.88 miles
|
ANEXIO VA1
|
|
0.88 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
0.92 miles
|
Equinix DC21
|
|
0.94 miles
|
Amazon 44862 Interconnection Plaza
|
|
0.96 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
0.97 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
0.97 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
0.98 miles
|
EdgeCore Ashburn
|
|
1.00 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
1.00 miles
|
Lumen Ashburn
|
|
1.01 miles
|
VPLS IAD
|
|
1.01 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
1.06 miles
|
PowerHouse Pacific
|
|
1.06 miles
|
Equinix Ashburn DC11
|
|
1.06 miles
|
Equinix Ashburn DC6
|
|
1.07 miles
|
NTT VA2
|
|
1.07 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
1.08 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
1.09 miles
|
COPT: 45751 Maries Rd
|
|
1.09 miles
|
Vantage VA13
|
|
1.11 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
1.11 miles
|
44490 Chilum Place: Digital Realty
|
|
1.11 miles
|
Digital Realty: Broderick Drive
|
|
1.11 miles
|
Vantage VA11
|
|
1.12 miles
|
Equinix Ashburn DC1
|
|
1.13 miles
|
COPT: 45761 Maries Rd
|
|
1.18 miles
|
ServerCentral Ashburn DC3
|
|
1.18 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
1.18 miles
|
Equinix Ashburn DC4
|
|
1.19 miles
|
44470 Chillum - Digital Realty
|
|
1.19 miles
|
Equinix Ashburn DC5
|
|
1.21 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
1.22 miles
|
Amazon IAD60
|
|
1.25 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
1.25 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
1.25 miles
|
Sentinel Ashburn
|
|
1.26 miles
|
Vantage VA12
|
|
1.26 miles
|
44751 Round Table (Bldg P)
|
|
1.26 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
1.26 miles
|
ANEXIO Ashburn IAD4
|
|
1.27 miles
|
Amazon IAD71
|
|
1.28 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
1.30 miles
|
CloudHQ LC2
|
|
1.31 miles
|
Amazon IAD50
|
|
1.31 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
1.31 miles
|
Rackspace Ashburn IAD3
|
|
1.34 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
1.34 miles
|
Cyxtera Sterling DC3
|
|
1.36 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
1.36 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
1.37 miles
|
Digital Realty: IAD43
|
|
1.37 miles
|
EdgeCore: Ashburn, AS01
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
1.40 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
1.41 miles
|
CyrusOne Sterling VIII
|
|
1.41 miles
|
CloudHQ Ashburn Campus
|
|
1.41 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
1.41 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
1.44 miles
|
Cyxtera Sterling DC2
|
|
1.44 miles
|
Amazon IAD-69
|
|
1.48 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
1.52 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
1.53 miles
|
Cyxtera Sterling DC4
|
|
1.54 miles
|
Vantage VA2 Campus
|
|
1.59 miles
|
Amazon 22370 Kipper
|
|
1.64 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
1.65 miles
|
Amazon 22420 Kipper
|
|
1.66 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
1.66 miles
|
EdgeCore: Ashburn, AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
1.68 miles
|
EdgeCore: Sterling, NV
|
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
1.68 miles
|
44274 Round Table (Bldg L)
|
|
1.69 miles
|
NTT Ashburn Campus
|
|
1.75 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
1.77 miles
|
44372 Round Table: Digital Realty
|
|
1.78 miles
|
NTT VA4
|
|
1.79 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
1.79 miles
|
Equinix DC13
|
|
1.80 miles
|
Amazon IAD76
|
|
1.81 miles
|
NTT VA5
|
|
1.82 miles
|
QTS Ashburn Lockridge
|
|
1.85 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
1.89 miles
|
Amazon IAD-51
|
|
1.90 miles
|
Amazon 45111 Loudoun Downs
|
|
1.92 miles
|
Amazon IAD-88
|
|
1.93 miles
|
Amazon IAD15
|
|
1.94 miles
|
Amazon IAD-56
|
|
2.00 miles
|
Amazon IAD16
|
|
2.00 miles
|
Aligned IAD02
|
|
2.02 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
2.10 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
2.11 miles
|
Amazon IAD12
|
|
2.16 miles
|
Amazon IAD-57
|
|
2.21 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
2.21 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
2.24 miles
|
Amazon IAD-58
|
|
2.27 miles
|
FastServ Ashburn
|
|
2.28 miles
|
DataBank Ashburn IAD3
|
|
2.28 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
2.31 miles
|
QTS Ashburn-Shellhorn DC2
|
|
2.35 miles
|
44351 Import Plz
|
|
2.40 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
2.40 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
2.40 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
2.42 miles
|
QTS Ashburn-Shellhorn
|
|
2.43 miles
|
Import Plz, Ashburn
|
|
2.46 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
2.47 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
2.47 miles
|
Amazon IAD-67
|
|
2.51 miles
|
AWS: 45950 Pathfinder Plz
|
|
2.53 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
2.53 miles
|
43915 Devin Shafron (Bldg A)
|
|
2.53 miles
|
Cyxtera IAD2-B
|
|
2.57 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
2.60 miles
|
43830 Devin Shafron (Bldg F)
|
|
2.61 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
2.62 miles
|
AWS: 45930 Pathfinder Plz
|
|
2.62 miles
|
43881 Devin Shafron (Bldg B)
|
|
2.63 miles
|
AWS: 22868 International Dr
|
|
2.64 miles
|
AWS: 22945 International Dr
|
|
2.65 miles
|
43790 Devin Shafron (Bldg E)
|
|
2.69 miles
|
45900 Pathfinder Plz
|
|
2.71 miles
|
AWS: 22900 Platform Plz
|
|
2.71 miles
|
43831 Devin Shafron (Bldg C)
|
|
2.78 miles
|
43791 Devin Shafron (Bldg D)
|
|
2.78 miles
|
Amazon IAD-54
|
|
4.78 miles
|
Lumen Herndon 1
|
|
4.80 miles
|
Lumen Herndon 3
|
|
4.89 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
5.01 miles
|
Cogent: 510 Huntmar
|
|
5.16 miles
|
Equinix DC97
|
|
5.21 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
5.28 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
5.50 miles
|
CyrusOne Sterling IX
|
|
5.54 miles
|
Compass Loudoun County
|
|
5.55 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
5.85 miles
|
InfoRelay Herndon
|
|
5.95 miles
|
Google Leesburg Stonewall Park
|
|
6.04 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
6.19 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
6.19 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
6.42 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
6.43 miles
|
Amazon Fadeley I
|
|
6.53 miles
|
Amazon Fadeley II
|
|
6.55 miles
|
Amazon Fadeley III
|
|
6.68 miles
|
Amazon 13600 EDS Drive
|
|
6.89 miles
|
InfoRelay Reston
|
|
6.93 miles
|
Google Dulles Arcola Center
|
|
7.08 miles
|
Amazon 25020 Willard Road
|
|
7.08 miles
|
Amazon Willard Road (Land)
|
|
7.13 miles
|
Google: Arcola 2
|
|
7.33 miles
|
Amazon 25420 Sutton Bay
|
|
7.35 miles
|
PowerHouse Arcola
|
|
7.44 miles
|
Amazon 25410 Sutton Bay
|
|
7.47 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
7.49 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
7.56 miles
|
Amazon Prediction Lane
|
|
7.58 miles
|
Amazon IAD-63
|
|
7.59 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
7.63 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
7.64 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
7.67 miles
|
IBM Softlayer Chantilly WDC01
|
|
7.68 miles
|
Amazon IAD61
|
|
7.72 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
7.73 miles
|
Microsoft Leesburg 1A
|
|
7.73 miles
|
ANEXIO Reston
|
|
7.74 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
7.78 miles
|
Amazon 41992 John Mosby Highway
|
|
7.90 miles
|
Microsoft Aldie
|
|
7.92 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
7.92 miles
|
Microsoft IAD11
|
|
8.04 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
8.26 miles
|
Amazon IAD9
|
|
8.39 miles
|
Amazon IAD22
|
|
8.39 miles
|
Amazon IAD1
|
|
10.27 miles
|
Penzance: Chantilly, VA
|
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
|
12.33 miles
|
Equinix Vienna DC8
|
|
13.53 miles
|
Cogent Vienna
|
|
13.57 miles
|
8100 Boone - Digital Realty
|
|
13.94 miles
|
DataBank McLean IAD2
|
|
13.98 miles
|
Lumen McLean 1
|
|
14.01 miles
|
Equinix Vienna DC7
|
|
14.05 miles
|
Element Critical VA1
|
|
14.65 miles
|
XO Fairfax
|
|
15.28 miles
|
AOL: 7777 Infantry Ridge
|
|
15.38 miles
|
Equinix Manassas DC14
|
|
16.50 miles
|
Amazon 7500 Bethlehem
|
|
16.59 miles
|
Amazon IAD7
|
|
16.62 miles
|
Amazon IAD24
|
|
16.68 miles
|
Amazon IAD11
|
|
16.72 miles
|
Amazon IAD-59
|
|
16.78 miles
|
Amazon IAD-52
|
|
16.86 miles
|
Amazon IAD14
|
|
16.94 miles
|
Corscale: Gainesville Crossing
|
|
16.99 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
17.34 miles
|
Amazon: 8190 Bethlehem
|
|
17.36 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
17.43 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
17.43 miles
|
Amazon Bethlehem Technology Park DC18
|
|
17.43 miles
|
Amazon Bethlehem Technology Park DC20
|
|
17.43 miles
|
Amazon Bethlehem Technology Park DC19
|
|
17.62 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
17.65 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
17.66 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
17.66 miles
|
Iron Mountain VA-2
|
|
17.68 miles
|
NTT Gainesville VA Campus
|
|
17.75 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
17.75 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
17.83 miles
|
Amazon IAD-73
|
|
17.83 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
17.84 miles
|
Opus Interactive Manassas
|
|
17.85 miles
|
Amazon IAD-74
|
|
18.00 miles
|
Amazon IAD-55
|
|
18.09 miles
|
Amazon: 15455 John Marshall
|
|
18.16 miles
|
Amazon 15465 John Marshall
|
|
18.23 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
18.28 miles
|
9020 Freedom Center
|
|
18.31 miles
|
Yondr Bristow Campus
|
|
18.36 miles
|
9040 Freedom Center
|
|
18.48 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
18.67 miles
|
QTS Manassas DC1
|
|
18.77 miles
|
QTS Manassas DC5
|
|
18.77 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
18.94 miles
|
QTS 10680 University Blvd
|
|
19.39 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
19.39 miles
|
Amazon IAD-77
|
|
19.39 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
19.39 miles
|
Evoswitch USA WDC 1
|
|
19.50 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
19.55 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
19.58 miles
|
Amazon: 11150 Thomasson Barn
|
|
19.60 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
19.61 miles
|
Amazon: 11200 Thomasson Barn
|
|
19.62 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
19.70 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
19.76 miles
|
AWS 10261 Tanner
|
|
19.87 miles
|
AWS IAD 101
|
|
19.89 miles
|
AWS 10281 Tanner Way
|
|
19.99 miles
|
AWS IAD 100
|
|