0.09 miles
|
Cogent Vienna
|
|
0.46 miles
|
Equinix Vienna DC7
|
|
0.50 miles
|
Element Critical VA1
|
|
0.79 miles
|
DataBank McLean IAD2
|
|
0.86 miles
|
Lumen McLean 1
|
|
1.41 miles
|
Equinix Vienna DC8
|
|
3.00 miles
|
XO Fairfax
|
|
5.95 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
5.95 miles
|
ANEXIO Reston
|
|
6.06 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
6.06 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
6.24 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
6.87 miles
|
InfoRelay Reston
|
|
7.88 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
7.88 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
8.19 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
8.79 miles
|
Equinix DC97
|
|
8.89 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
8.96 miles
|
Cogent: 510 Huntmar
|
|
8.99 miles
|
XO (4301 Connecticut)
|
|
9.10 miles
|
Lumen Herndon 3
|
|
9.11 miles
|
Lumen Herndon 1
|
|
9.58 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
10.39 miles
|
XO: 1120 Vermont
|
|
10.40 miles
|
Cogent: 1120 Vermont
|
|
10.40 miles
|
Level3 Washington
|
|
10.46 miles
|
CoreSite DC2
|
|
10.60 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
10.61 miles
|
XO (1220 L)
|
|
10.85 miles
|
Amazon 13600 EDS Drive
|
|
10.98 miles
|
InfoRelay Herndon
|
|
11.13 miles
|
45900 Pathfinder Plz
|
|
11.16 miles
|
AWS: 45930 Pathfinder Plz
|
|
11.32 miles
|
AWS: 45950 Pathfinder Plz
|
|
11.42 miles
|
AWS: 22900 Platform Plz
|
|
11.69 miles
|
AWS: 22868 International Dr
|
|
11.70 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
11.73 miles
|
Cyxtera IAD2-B
|
|
11.79 miles
|
AWS: 22945 International Dr
|
|
11.80 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
12.27 miles
|
Amazon IAD9
|
|
12.31 miles
|
Amazon IAD1
|
|
12.38 miles
|
Amazon IAD22
|
|
12.42 miles
|
Vantage VA2 Campus
|
|
12.51 miles
|
CyrusOne Sterling VIII
|
|
12.52 miles
|
Amazon IAD-51
|
|
12.54 miles
|
Amazon IAD-56
|
|
12.56 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
12.57 miles
|
Amazon 22420 Kipper
|
|
12.58 miles
|
Cyxtera Sterling DC4
|
|
12.59 miles
|
Cyxtera Sterling DC2
|
|
12.61 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
12.62 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
12.64 miles
|
Amazon IAD-58
|
|
12.65 miles
|
Amazon 22370 Kipper
|
|
12.67 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
12.69 miles
|
Amazon IAD-57
|
|
12.70 miles
|
Cyxtera Sterling DC3
|
|
12.73 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
12.75 miles
|
Amazon 45111 Loudoun Downs
|
|
12.75 miles
|
Amazon IAD-69
|
|
12.77 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
12.78 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
12.78 miles
|
Amazon IAD-88
|
|
12.85 miles
|
COPT: 45761 Maries Rd
|
|
12.89 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
12.92 miles
|
Vantage VA11
|
|
12.96 miles
|
Sentinel Ashburn
|
|
12.97 miles
|
Vantage VA12
|
|
12.98 miles
|
COPT: 45751 Maries Rd
|
|
13.00 miles
|
Amazon IAD12
|
|
13.01 miles
|
Vantage VA13
|
|
13.07 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
13.09 miles
|
Amazon IAD16
|
|
13.10 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
13.12 miles
|
Amazon IAD15
|
|
13.16 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
13.20 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
13.24 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
13.25 miles
|
IBM Softlayer Chantilly WDC01
|
|
13.27 miles
|
Amazon IAD76
|
|
13.33 miles
|
Amazon 45305 Severn
|
|
13.39 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
13.40 miles
|
Amazon IAD10
|
|
13.41 miles
|
Amazon 45259 Severn
|
|
13.45 miles
|
PowerHouse Pacific
|
|
13.47 miles
|
Amazon IAD32
|
|
13.48 miles
|
21710 Charles View
|
|
13.54 miles
|
CyrusOne Northern Virginia Sterling V
|
|
13.56 miles
|
Amazon 25420 Sutton Bay
|
|
13.57 miles
|
21641 Charles View
|
|
13.57 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
13.60 miles
|
Digital Realty: Broderick Drive
|
|
13.61 miles
|
QTS Ashburn Lockridge
|
|
13.62 miles
|
Digital Realty: IAD43
|
|
13.68 miles
|
Amazon 25410 Sutton Bay
|
|
13.70 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
13.83 miles
|
Amazon Willard Road (Land)
|
|
13.96 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
14.01 miles
|
Equinix DC21
|
|
14.07 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
14.10 miles
|
PowerHouse ABX1
|
|
14.13 miles
|
44751 Round Table (Bldg P)
|
|
14.19 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
14.19 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
14.20 miles
|
Equinix DC15
|
|
14.21 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
14.29 miles
|
VPLS IAD
|
|
14.29 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
14.30 miles
|
Amazon 44854 Interconnection
|
|
14.31 miles
|
44351 Import Plz
|
|
14.32 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
14.32 miles
|
Amazon IAD61
|
|
14.32 miles
|
Equinix Ashburn DC6
|
|
14.32 miles
|
Equinix Ashburn DC11
|
|
14.36 miles
|
Amazon 44858 Interconnection Plaza
|
|
14.38 miles
|
Amazon IAD-63
|
|
14.39 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
14.40 miles
|
CloudHQ Ashburn Campus
|
|
14.40 miles
|
CloudHQ LC2
|
|
14.41 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
14.41 miles
|
Equinix Ashburn DC1
|
|
14.42 miles
|
ANEXIO VA1
|
|
14.42 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
14.45 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
14.48 miles
|
Equinix Ashburn DC5
|
|
14.49 miles
|
Amazon Prediction Lane
|
|
14.50 miles
|
Import Plz, Ashburn
|
|
14.50 miles
|
Amazon 44862 Interconnection Plaza
|
|
14.52 miles
|
Lumen Ashburn
|
|
14.53 miles
|
44274 Round Table (Bldg L)
|
|
14.53 miles
|
Equinix Ashburn DC4
|
|
14.54 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
14.55 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
14.56 miles
|
QTS Ashburn-Shellhorn DC2
|
|
14.58 miles
|
44490 Chilum Place: Digital Realty
|
|
14.60 miles
|
44372 Round Table: Digital Realty
|
|
14.61 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
14.61 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
14.62 miles
|
QTS Ashburn-Shellhorn
|
|
14.62 miles
|
NTT VA2
|
|
14.66 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
14.67 miles
|
ServerCentral Ashburn DC3
|
|
14.67 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
14.68 miles
|
44470 Chillum - Digital Realty
|
|
14.68 miles
|
ANEXIO Ashburn IAD4
|
|
14.68 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
14.69 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
14.71 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
14.74 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
14.74 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
14.75 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
14.76 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
14.76 miles
|
Rackspace Ashburn IAD3
|
|
14.79 miles
|
Amazon IAD60
|
|
14.80 miles
|
Equinix DC13
|
|
14.82 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
14.84 miles
|
Amazon IAD71
|
|
14.87 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
14.87 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
14.87 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
14.87 miles
|
Amazon IAD50
|
|
14.88 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
14.88 miles
|
Amazon IAD-67
|
|
14.94 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
14.97 miles
|
Aligned IAD02
|
|
15.04 miles
|
NTT Ashburn Campus
|
|
15.05 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
15.06 miles
|
43915 Devin Shafron (Bldg A)
|
|
15.11 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
15.11 miles
|
43881 Devin Shafron (Bldg B)
|
|
15.13 miles
|
NTT VA5
|
|
15.16 miles
|
NTT VA4
|
|
15.19 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
15.21 miles
|
43830 Devin Shafron (Bldg F)
|
|
15.24 miles
|
43831 Devin Shafron (Bldg C)
|
|
15.31 miles
|
43790 Devin Shafron (Bldg E)
|
|
15.32 miles
|
CyrusOne Sterling IX
|
|
15.33 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
15.34 miles
|
43791 Devin Shafron (Bldg D)
|
|
15.34 miles
|
Amazon IAD-54
|
|
15.44 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
15.44 miles
|
FastServ Ashburn
|
|
15.52 miles
|
DataBank Ashburn IAD3
|
|
16.00 miles
|
Amazon Fadeley I
|
|
16.01 miles
|
Amazon Fadeley II
|
|
16.13 miles
|
Amazon Fadeley III
|
|
16.36 miles
|
Google: Arcola 2
|
|
16.39 miles
|
Google Dulles Arcola Center
|
|
16.79 miles
|
PowerHouse Arcola
|
|
17.13 miles
|
Equinix Manassas DC14
|
|
17.15 miles
|
AOL: 7777 Infantry Ridge
|
|
17.22 miles
|
12401 Prosperity Dr: Lincoln Rackhouse
|
12401 Prosperity Dr. is an enterprise grade, highly-secure data center located just 15 miles north of Washington D.C., in Silver Spring, MD.
|
17.24 miles
|
Agile Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
17.50 miles
|
Amazon 41992 John Mosby Highway
|
|
17.59 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
17.90 miles
|
Microsoft IAD11
|
|
18.09 miles
|
Microsoft Aldie
|
|
18.24 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
18.37 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
18.39 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
18.51 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
18.68 miles
|
Amazon 7500 Bethlehem
|
|
18.77 miles
|
AiNET Beltsville WDC-1
|
|
18.80 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
18.82 miles
|
Amazon IAD7
|
|
18.85 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
18.87 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
18.89 miles
|
Amazon IAD24
|
|
18.92 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
18.93 miles
|
9020 Freedom Center
|
|
18.94 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
18.96 miles
|
Amazon IAD11
|
|
18.98 miles
|
QTS Manassas DC1
|
|
18.99 miles
|
Compass Loudoun County
|
|
19.02 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
19.02 miles
|
9040 Freedom Center
|
|
19.21 miles
|
QTS 10680 University Blvd
|
|
19.26 miles
|
Amazon Bethlehem Technology Park DC18
|
|
19.28 miles
|
Amazon: 8190 Bethlehem
|
|
19.30 miles
|
QTS Manassas DC5
|
|
19.30 miles
|
Amazon IAD-59
|
|
19.31 miles
|
Amazon IAD-52
|
|
19.32 miles
|
AWS 10261 Tanner
|
|
19.35 miles
|
Amazon IAD14
|
|
19.37 miles
|
Amazon Bethlehem Technology Park DC19
|
|
19.41 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
19.41 miles
|
AWS 10281 Tanner Way
|
|
19.42 miles
|
Amazon Bethlehem Technology Park DC20
|
|
19.47 miles
|
Google Leesburg Stonewall Park
|
|
19.47 miles
|
AWS IAD 101
|
|
19.54 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
19.55 miles
|
AWS IAD 100
|
|
19.56 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
19.60 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
19.66 miles
|
Iron Mountain VA-2
|
|
19.68 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
19.72 miles
|
Opus Interactive Manassas
|
|
19.76 miles
|
CloudHQ MCC2
|
|
19.87 miles
|
Lerner: Maryland, WA
|
|
19.88 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
19.91 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
19.92 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
19.94 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
19.98 miles
|
CloudHQ MCC3
|
|