0.50 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
1.47 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
1.97 miles
|
Google Leesburg Stonewall Park
|
|
2.58 miles
|
Compass Loudoun County
|
|
3.11 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
5.91 miles
|
DataBank Ashburn IAD3
|
|
6.01 miles
|
FastServ Ashburn
|
|
6.02 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
6.14 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
6.18 miles
|
NTT VA4
|
|
6.23 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
6.24 miles
|
NTT VA5
|
|
6.30 miles
|
NTT Ashburn Campus
|
|
6.40 miles
|
43790 Devin Shafron (Bldg E)
|
|
6.41 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
6.43 miles
|
Amazon IAD50
|
|
6.43 miles
|
43791 Devin Shafron (Bldg D)
|
|
6.43 miles
|
Amazon IAD-54
|
|
6.46 miles
|
Amazon IAD71
|
|
6.50 miles
|
43830 Devin Shafron (Bldg F)
|
|
6.51 miles
|
Aligned IAD02
|
|
6.51 miles
|
Amazon IAD60
|
|
6.53 miles
|
43831 Devin Shafron (Bldg C)
|
|
6.54 miles
|
Rackspace Ashburn IAD3
|
|
6.54 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
6.58 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
6.58 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
6.60 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
6.60 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
6.62 miles
|
44470 Chillum - Digital Realty
|
|
6.63 miles
|
ServerCentral Ashburn DC3
|
|
6.63 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
6.63 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
6.63 miles
|
ANEXIO Ashburn IAD4
|
|
6.63 miles
|
43881 Devin Shafron (Bldg B)
|
|
6.64 miles
|
Equinix DC13
|
|
6.64 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
6.65 miles
|
43915 Devin Shafron (Bldg A)
|
|
6.67 miles
|
NTT VA2
|
|
6.68 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
6.71 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
6.71 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
6.71 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
6.71 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
6.72 miles
|
44490 Chilum Place: Digital Realty
|
|
6.76 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
6.77 miles
|
Lumen Ashburn
|
|
6.80 miles
|
Amazon 44862 Interconnection Plaza
|
|
6.80 miles
|
Equinix Ashburn DC4
|
|
6.82 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
6.82 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
6.82 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
6.83 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
6.85 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
6.85 miles
|
Amazon IAD-67
|
|
6.85 miles
|
Equinix Ashburn DC5
|
|
6.85 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
6.88 miles
|
ANEXIO VA1
|
|
6.88 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
6.88 miles
|
44372 Round Table: Digital Realty
|
|
6.92 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
6.92 miles
|
Equinix Ashburn DC1
|
|
6.93 miles
|
44274 Round Table (Bldg L)
|
|
6.93 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
6.95 miles
|
Amazon 44858 Interconnection Plaza
|
|
6.97 miles
|
CloudHQ LC2
|
|
6.98 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
7.00 miles
|
CloudHQ Ashburn Campus
|
|
7.01 miles
|
Amazon 44854 Interconnection
|
|
7.01 miles
|
Equinix Ashburn DC11
|
|
7.01 miles
|
Equinix Ashburn DC6
|
|
7.04 miles
|
VPLS IAD
|
|
7.04 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
7.09 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
7.09 miles
|
Equinix DC15
|
|
7.11 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
7.13 miles
|
QTS Ashburn-Shellhorn
|
|
7.14 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
7.15 miles
|
QTS Ashburn-Shellhorn DC2
|
|
7.19 miles
|
PowerHouse ABX1
|
|
7.26 miles
|
44751 Round Table (Bldg P)
|
|
7.27 miles
|
Import Plz, Ashburn
|
|
7.32 miles
|
Equinix DC21
|
|
7.36 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
7.43 miles
|
44351 Import Plz
|
|
7.48 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
7.73 miles
|
21641 Charles View
|
|
7.79 miles
|
Digital Realty: Broderick Drive
|
|
7.80 miles
|
CyrusOne Northern Virginia Sterling V
|
|
7.81 miles
|
21710 Charles View
|
|
7.82 miles
|
Digital Realty: IAD43
|
|
7.85 miles
|
Amazon IAD32
|
|
7.88 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
7.90 miles
|
Amazon 45259 Severn
|
|
7.93 miles
|
PowerHouse Pacific
|
|
7.93 miles
|
Amazon IAD10
|
|
7.96 miles
|
QTS Ashburn Lockridge
|
|
7.98 miles
|
Amazon 45305 Severn
|
|
8.04 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
8.14 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
8.27 miles
|
Amazon IAD76
|
|
8.34 miles
|
Vantage VA13
|
|
8.36 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
8.38 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
8.41 miles
|
Vantage VA12
|
|
8.41 miles
|
Sentinel Ashburn
|
|
8.42 miles
|
Vantage VA11
|
|
8.43 miles
|
COPT: 45751 Maries Rd
|
|
8.45 miles
|
Amazon IAD15
|
|
8.47 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
8.49 miles
|
Microsoft Aldie
|
|
8.50 miles
|
Amazon IAD16
|
|
8.55 miles
|
COPT: 45761 Maries Rd
|
|
8.55 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
8.62 miles
|
Amazon IAD12
|
|
8.64 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
8.65 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
8.68 miles
|
CyrusOne Sterling IX
|
|
8.68 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
8.68 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
8.71 miles
|
Amazon IAD-69
|
|
8.73 miles
|
Cyxtera Sterling DC3
|
|
8.74 miles
|
Amazon IAD-88
|
|
8.74 miles
|
Microsoft IAD11
|
|
8.76 miles
|
Amazon 22370 Kipper
|
|
8.76 miles
|
Amazon 45111 Loudoun Downs
|
|
8.84 miles
|
Amazon 22420 Kipper
|
|
8.84 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
8.85 miles
|
Cyxtera Sterling DC2
|
|
8.85 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
8.87 miles
|
Cyxtera Sterling DC4
|
|
8.90 miles
|
Amazon IAD-57
|
|
8.90 miles
|
CyrusOne Sterling VIII
|
|
8.94 miles
|
Vantage VA2 Campus
|
|
8.94 miles
|
Amazon IAD-56
|
|
8.94 miles
|
Amazon Fadeley I
|
|
8.95 miles
|
Amazon Fadeley III
|
|
8.95 miles
|
Amazon IAD-51
|
|
8.96 miles
|
Amazon IAD-58
|
|
8.99 miles
|
Amazon 41992 John Mosby Highway
|
|
9.04 miles
|
Amazon Fadeley II
|
|
9.11 miles
|
Google Dulles Arcola Center
|
|
9.12 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
9.21 miles
|
PowerHouse Arcola
|
|
9.38 miles
|
Google: Arcola 2
|
|
9.69 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
9.77 miles
|
AWS: 22945 International Dr
|
|
9.77 miles
|
Cyxtera IAD2-B
|
|
9.79 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
9.83 miles
|
AWS: 22868 International Dr
|
|
10.05 miles
|
AWS: 22900 Platform Plz
|
|
10.05 miles
|
AWS: 45950 Pathfinder Plz
|
|
10.19 miles
|
AWS: 45930 Pathfinder Plz
|
|
10.24 miles
|
45900 Pathfinder Plz
|
|
11.42 miles
|
Amazon Prediction Lane
|
|
11.42 miles
|
Amazon Willard Road (Land)
|
|
11.52 miles
|
Amazon IAD-63
|
|
11.66 miles
|
Amazon IAD61
|
|
11.84 miles
|
Amazon 25420 Sutton Bay
|
|
11.86 miles
|
Amazon 25410 Sutton Bay
|
|
11.98 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
12.13 miles
|
InfoRelay Herndon
|
|
12.34 miles
|
Lumen Herndon 1
|
|
12.36 miles
|
Lumen Herndon 3
|
|
12.36 miles
|
IBM Softlayer Chantilly WDC01
|
|
12.38 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
12.41 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
12.54 miles
|
Cogent: 510 Huntmar
|
|
12.71 miles
|
Equinix DC97
|
|
12.74 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
12.82 miles
|
Amazon 13600 EDS Drive
|
|
12.88 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
13.48 miles
|
Amazon IAD9
|
|
13.51 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
13.55 miles
|
Amazon IAD22
|
|
13.58 miles
|
Amazon IAD1
|
|
13.72 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
13.72 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
13.94 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
14.54 miles
|
InfoRelay Reston
|
|
15.15 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
15.32 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
15.32 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
15.42 miles
|
ANEXIO Reston
|
|
15.42 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
15.70 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
16.93 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
17.78 miles
|
Rowan: Frederick County, Maryland
|
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland. The campus is set to offer 231MW.
|
18.49 miles
|
Amazon IAD-55
|
|
18.50 miles
|
Amazon: 15455 John Marshall
|
|
18.56 miles
|
Amazon 15465 John Marshall
|
|
18.81 miles
|
Quantum Loophole: Frederick Campus
|
|
18.85 miles
|
AOL: 7777 Infantry Ridge
|
|
18.98 miles
|
Equinix Manassas DC14
|
|
18.99 miles
|
Corscale: Gainesville Crossing
|
|
19.02 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
19.09 miles
|
NTT Gainesville VA Campus
|
|
19.16 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.32 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.42 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
19.49 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
19.54 miles
|
Amazon IAD-59
|
|
19.60 miles
|
Amazon 7500 Bethlehem
|
|
19.61 miles
|
Amazon IAD-52
|
|
19.64 miles
|
Amazon IAD24
|
|
19.64 miles
|
Amazon IAD7
|
|
19.68 miles
|
Amazon IAD11
|
|
19.70 miles
|
Amazon IAD14
|
|
19.82 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|