Terremark Pleasanton

5667 Gibraltar Drive

░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Map and Nearby Locations:

5667 Gibraltar Drive
Click Map to begin Search

Sites within 15 miles of Terremark Pleasanton

Show SqM
Distance Site About
11.48 miles AT&T Hayward
12.97 miles Prime Hayward
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
13.24 miles 34551 Ardenwood
13.58 miles Lumen Hayward 1
13.77 miles T5@Silicon Valley (Newark)
T5 acquired the facility from Apple in 2020.
13.89 miles Hurricane Electric Fremont 1
2 Internet Exchange Points (SFMIX and AMS-IX Bay) 20 Internet Networks 6 Carriers with Diverse Fiber
14.83 miles XO Fremont
15.07 miles Hurricane Electric Fremont 2
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX) 70 Internet Networks 7 Carriers with Diverse Fiber
15.30 miles 1055 Page Ave
Tesla/Solar City currently lease the building.
15.33 miles 47700 Kato Road
Tesla/Solar City currently lease the building.
18.49 miles Microsoft San Jose (Prospective)
Microsoft paid $73.2 million for the land on the western banks of Coyote Creek in September 2017.
18.88 miles 400 Holger Way, San Jose
19.59 miles CoreSite Milpitas SV2
19.66 miles 2334 Lundy Place - Digital Realty
Currently leased to a Triple Net customer, NTT Communications.
19.72 miles Stack: SVY01D
Stack has filed for permission to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
19.75 miles STACK Silicon Valley SVY01
Phase I supports 9.3 MW of critical power
19.78 miles STACK SVY01B
Stack Infrastructure has launched a 32MW SVY01B facility on its Silicon Valley campus in California
19.78 miles Rowan: Matterhorn, CA
Outside of Oregon and Temple, Rowan Green Data is planning a data center site in California named as Project Matterhorn.
19.82 miles Stack: SVY01C
Stack has filed for permission to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
19.87 miles DataBank Santa Clara SFO1
19.92 miles Equinix San Jose SV13
19.92 miles H5 San Jose
The H5 San Jose data center is in a 73,000 SF data center located at 2030 Fortune Drive near downtown San Jose.

Terremark Pleasanton Data Center Photos

Operating Company

86 Facilities Owned
52 Markets Served
41.91 Megawatts
View Company

News

Read More News