0.18 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
0.47 miles
|
CloudHQ MCC2
|
|
1.32 miles
|
AWS IAD 100
|
|
1.36 miles
|
AWS 10281 Tanner Way
|
|
1.43 miles
|
AWS IAD 101
|
|
1.48 miles
|
AWS 10261 Tanner
|
|
1.58 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
2.34 miles
|
Amazon: 9740 Innovation Drive
|
Amazon is building another data center in it's Innovation Drive campus.
|
2.39 miles
|
Amazon: IAD-106
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
2.42 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
2.47 miles
|
Amazon: IAD-105
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
2.56 miles
|
Amazon: IAD-104
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
2.57 miles
|
Amazon: 11150 Thomasson Barn
|
|
2.59 miles
|
QTS 10680 University Blvd
|
QTS is looking to expand its existing footprint in Prince William County. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
2.61 miles
|
Amazon: 11200 Thomasson Barn
|
|
2.69 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
2.74 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
2.78 miles
|
QTS Manassas DC1
|
|
2.78 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
2.85 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
2.85 miles
|
Amazon IAD-77
|
|
2.85 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
2.85 miles
|
Evoswitch USA WDC 1
|
|
2.91 miles
|
QTS Manassas DC5
|
|
2.99 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
3.01 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
3.09 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
3.26 miles
|
9040 Freedom Center
|
|
3.27 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
3.30 miles
|
9020 Freedom Center
|
|
3.83 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
4.24 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
4.56 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
4.67 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
4.70 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
4.75 miles
|
Opus Interactive Manassas
|
|
4.85 miles
|
Amazon Bethlehem Technology Park DC18
|
|
4.90 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
4.95 miles
|
Iron Mountain VA-2
|
|
4.96 miles
|
Amazon Bethlehem Technology Park DC19
|
|
5.00 miles
|
Amazon: 8190 Bethlehem
|
|
5.03 miles
|
Amazon Bethlehem Technology Park DC20
|
|
5.04 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
5.34 miles
|
Amazon IAD-74
|
|
5.42 miles
|
Amazon IAD-73
|
|
5.62 miles
|
Amazon 7500 Bethlehem
|
|
5.62 miles
|
Amazon IAD7
|
|
5.63 miles
|
Amazon IAD11
|
|
5.65 miles
|
Amazon IAD24
|
|
5.67 miles
|
Microsoft: MNZ03
|
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
5.78 miles
|
Amazon IAD14
|
|
5.85 miles
|
Amazon IAD-52
|
|
5.93 miles
|
Amazon IAD-59
|
|
5.99 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
6.02 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
6.05 miles
|
Equinix Manassas DC14
|
|
6.06 miles
|
Microsoft: MNZ02
|
Microsoft has begun work on a new data center campus in Prince William County, Virginia. Microsoft is constructing two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet.
|
6.17 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
6.18 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
6.20 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
6.24 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
6.73 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
6.90 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
6.97 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
7.26 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
7.39 miles
|
Corscale: Gainesville Crossing
|
|
7.41 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
8.51 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
|
9.04 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
9.78 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
9.80 miles
|
OVH US East Vint Hill
|
|
10.63 miles
|
Amazon IAD-55
|
|
10.83 miles
|
Amazon: 15455 John Marshall
|
|
10.83 miles
|
Amazon 15465 John Marshall
|
|
11.01 miles
|
Parkstone Tech Park
|
|
12.74 miles
|
Amazon IAD22
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
12.75 miles
|
Amazon IAD1
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
12.88 miles
|
Amazon IAD9
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
13.20 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
13.21 miles
|
Amazon: 3980 Virginia Mallory Dr
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
13.21 miles
|
Amazon: 14501 Avion Pkwy
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
13.44 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
13.49 miles
|
IBM Softlayer Chantilly WDC01
|
|
13.73 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
13.75 miles
|
Amazon IAD61
|
|
13.81 miles
|
Amazon 25410 Sutton Bay
|
|
13.89 miles
|
Amazon IAD-63
|
|
13.89 miles
|
Amazon 25420 Sutton Bay
|
|
13.95 miles
|
Amazon Prediction Lane
|
|
14.16 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
14.73 miles
|
Amazon EDS Herndon Campus
|
|
14.74 miles
|
Amazon EDS (Bldg C)
|
|
14.81 miles
|
Amazon IAD-166
|
|
14.84 miles
|
Amazon EDS (Bldg D)
|
|
15.51 miles
|
InfoRelay Herndon
|
|
15.61 miles
|
Renaissance Technology Park
|
Renaissance Technology Park in Oak Hill is redeveloping their site with 2,136,040 square feet into data centers.
|
15.66 miles
|
Amazon: Warrenton, VA
|
Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.
|
15.67 miles
|
Google: Arcola 2
|
|
15.82 miles
|
PowerHouse Arcola
|
|
15.85 miles
|
Amazon 41992 John Mosby Highway
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
15.94 miles
|
Google Dulles Arcola Center
|
|
15.96 miles
|
Amazon: 42139 Reeds Farm Lane
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
16.07 miles
|
Amazon Fadeley II
|
|
16.15 miles
|
Amazon Fadeley III
|
|
16.18 miles
|
Amazon Fadeley I
|
|
16.19 miles
|
Amazon: Racefield Ln
|
|
16.34 miles
|
Microsoft IAD11
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
16.35 miles
|
Amazon: Quail Ridge 4
|
Amazon is constructing it's fourth data center building known as Building D at its Quail Ridge campus. At full buildout, the two-story data center will span 275,500 square feet.
|
16.37 miles
|
Yondr Arcola, VA
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company announced it had energized the first phase of the first building in December 2023.
|
16.37 miles
|
Amazon: IAD125
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
16.44 miles
|
Microsoft: IAD12
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
16.48 miles
|
Amazon: Quail Ridge 3
|
Amazon is constructing a third data center building known as Building C at its Quail Ridge campus. At full buildout, the two-story data center building will span 275,500 square feet.
|
16.48 miles
|
Amazon: IAD124
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
16.51 miles
|
Yondr Arcola Bldg 2
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company announced it had energized the first phase of the first building in December 2023.
|
16.54 miles
|
Microsoft: IAD13
|
Microsoft is constructing another single-story data center building known as IAD13 at it's Aldie Campus. The facility will span 102,022 square feet at full build out.
|
16.74 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center with 400,000 square feet of raised white floor space, 50,000 square feet of office space, and 30,000 square feet for support services.
|
16.84 miles
|
Amazon: 7951 Loisdale Rd
|
Amazon is building a 120,000 sq ft, two-story data center at 7951 & 7961 Loisdale Rd, Springfield, VA.
|
16.95 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
17.04 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
17.43 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
17.68 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
17.68 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
17.72 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
18.13 miles
|
Equinix DC97
|
|
18.14 miles
|
Cogent: 510 Huntmar
|
|
18.26 miles
|
InfoRelay Reston
|
|
18.31 miles
|
Lumen Herndon 3
|
|
18.33 miles
|
Lumen Herndon 1
|
|
18.39 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
18.42 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
18.42 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
18.46 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
18.50 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
18.64 miles
|
Amazon IAD-175
|
|
18.71 miles
|
AWS: 22945 International Dr
|
|
18.79 miles
|
AWS: 22868 International Dr
|
|
18.81 miles
|
Amazon IAD140
|
|
18.88 miles
|
Amazon IAD-141
|
|
18.88 miles
|
Amazon IAD-58
|
|
18.89 miles
|
Cyxtera IAD2-B
|
|
18.91 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
18.93 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
18.96 miles
|
Amazon IAD-57
|
|
19.01 miles
|
Amazon IAD12
|
|
19.03 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
19.04 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
19.12 miles
|
Amazon IAD16
|
|
19.20 miles
|
Amazon IAD15
|
|
19.21 miles
|
Amazon IAD-88
|
|
19.22 miles
|
Amazon IAD-56
|
|
19.23 miles
|
Amazon 45111 Loudoun Downs
|
|
19.26 miles
|
45900 Pathfinder Plz
|
|
19.28 miles
|
Amazon IAD-51
|
|
19.31 miles
|
44351 Import Plz
|
|
19.33 miles
|
AWS: 45950 Pathfinder Plz
|
|
19.35 miles
|
Amazon IAD76
|
|
19.36 miles
|
AWS: 45930 Pathfinder Plz
|
|
19.37 miles
|
Import Plz, Ashburn
|
|
19.38 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
19.43 miles
|
QTS Ashburn Lockridge
|
|
19.44 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
19.46 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
19.48 miles
|
QTS Ashburn-Shellhorn
|
|
19.53 miles
|
Amazon 22420 Kipper
|
|
19.54 miles
|
QTS Ashburn-Shellhorn DC2
|
|
19.58 miles
|
Amazon 22370 Kipper
|
|
19.67 miles
|
Amazon IAD-67
|
|
19.67 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
19.70 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
19.74 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
19.74 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
19.74 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
19.74 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
19.75 miles
|
Vantage VA2 Campus
|
|
19.75 miles
|
43881 Devin Shafron (Bldg B)
|
|
19.79 miles
|
43831 Devin Shafron (Bldg C)
|
|
19.79 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
19.80 miles
|
43915 Devin Shafron (Bldg A)
|
|
19.83 miles
|
43791 Devin Shafron (Bldg D)
|
|
19.83 miles
|
Amazon IAD-54
|
|
19.86 miles
|
Digital Realty: IAD43
|
|
19.87 miles
|
Vantage VA12
|
|
19.87 miles
|
Sentinel Ashburn
|
|
19.89 miles
|
Cogent Vienna
|
|
19.89 miles
|
43830 Devin Shafron (Bldg F)
|
|
19.93 miles
|
Gigaland: Remington, VA
|
Gigaland proposed six data centers on about 200 acres outside Remington on the south side Lucky Hill Road.
|
19.93 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
19.95 miles
|
43790 Devin Shafron (Bldg E)
|
|
19.95 miles
|
Equinix Vienna DC7
|
|
19.98 miles
|
Element Critical VA1
|
|
19.98 miles
|
8100 Boone - Digital Realty
|
|