Amazon AWS Logo

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

  • Operating 219 data centers in 31 markets.
  • Their largest faciilty is AWS PDX111.
  • The company has 26 sites under construction.

219 Facilities Owned

31 Markets Served

░░░░░░ Login to view MW Total Power

Amazon AWS Data Center Map

Amazon AWS Locations

AWS Olson Rd Campus

Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.

Amazon: 6675 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.

Amazon: TTC Industrial Area

Amazon Data Services Pvt Ltd has sub-leased 4.51 lakh sq ft of plot in TTC industrial area in Bonsari in Airoli for a period of 15 years (starting in August 2023.)

Amazon: 6655 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.

Amazon Hermiston, OR

Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon: Melbourne, Victoria.

Amazon is planning a $50m data center on a 13.2-hectare site at 54-80 Ferris Road, Cobblebank, about 40km west of Melbourne’s center.

Amazon: Portage, IN

Amazon is building a new $87 million data center in Portage. The location is confirmed as the AmeriPlex at the Port business park north of Interstate 94 and south of the Port of Indiana-Burns Harbor on Lake Michigan.

Amazon: 6665 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.

Amazon: Quail Ridge 4

Amazon is constructing it's fourth data center building known as Building D at its Quail Ridge campus. At full buildout, the two-story data center will span 275,500 square feet.

AWS: Santa Clara, CA

Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.

Amazon: Cosgray Rd Campus

AWS is building its second data center campus in Hilliard, Ohio. The $200 million data center campus is located on a 104-acre site between Cosgray and Leppert roads.

Amazon 41992 John Mosby Highway

Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.

AWS: Nokesville Road Campus

Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.

Amazon: 77954 Cottonwood Bend

The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon Clonshaugh Park

Amazon is planning to build two data center buildings in Clonshaugh close to existing and future planned facilities within the Clonshaugh Business and Technology Park. The site currently holds a former Ricoh building and was once earmarked for a T5 data center.

Amazon: New Carlisle, IN

Amazon AWS is building a $11bn data center campus in Indiana. Amazon acquired more than 600 acres of agricultural land around New Carlisle in St. Joseph County in 2023 using the shell company Razor5.

AWS: Costas Campus

Amazon Web Services (AWS) plans to invest $10 billion to build two data center complexes at industrial parks in Madison County, an area just north of the state’s capital, Jackson.

Amazon: Quail Ridge 3

Amazon is constructing a third data center building known as Building C at its Quail Ridge campus. At full buildout, the two-story data center building will span 275,500 square feet.

Amazon: 42139 Reeds Farm Lane

Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.

Amazon: 6645 Crosby Ct

Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.

Amazon PDX110

The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).

AWS PDX111

The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration

AWS: Madison County Mega Site Campus

Amazon Web Services (AWS) plans to invest $10 billion to build two data center complexes at industrial parks in Madison County, an area just north of the state’s capital, Jackson.

Amazon PDX109

The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration

Amazon: 4612 Cosgray Rd

AWS is building its second data center campus in Hilliard, Ohio. The $200 million data center campus is located on a 104-acre site between Cosgray and Leppert roads.

Amazon: Elliot Campus, Mesa

Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.

Amazon: Tanjong Kling 1

Mapletree Sunview 1 is a six-storey build-to-suit (“BTS”) data centre with a gross floor area of about 242,000 square feet.

Amazon: Hermiston 4

The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon AWS: Louisa County, Virginia

Amazon has proposed developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia. The campus would span more than 1.7 million sq ft (157,935 sqm) at full build-out.

Amazon: Pecos Campus, Mesa

Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.

Amazon: Hermiston 3

The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.

Amazon AWS Data Center Photos


AWS Full Site Plan for Data Centre Campus in Mulhuddart
Posted in Amazon Dublin Mulhuddart Campus
Source: Fingal County Council
The campus, if approved, could contain upto eight ASW data centres. The campus is located Northwest of Dublin
Proposed Locatino of Mulhddart Campus
Posted in Amazon Dublin Mulhuddart Campus

The campus, if approved, could contain upto eight ASW data centres. The campus is located Northwest of Dublin

Source: Fingal County Council

Expected Water Usage for Mulhaddart Data Centre Campus
Posted in Amazon Dublin Mulhuddart Campus
Source: AWS Document Supplied for Fingal County Council Approvals

Satellite View Next to IAD74
Posted in Amazon IAD-73

AWS Facility IAD-73
Posted in Amazon IAD-73

AWS Facility IAD-74
Posted in Amazon IAD-74
One of three campuses in the US East (Ohio) Region
AWS's New Albany Campus (US East: Ohio)
Posted in Amazon New Albany

One of three campuses in the US East (Ohio) Region


IAD50, 60, and 71
Posted in Amazon IAD71
Santa Clara industrial building at 2305 Mission Blvd. IPI Partners acquired the building in December 2019 in Santa Clara, part of an intricate series of deals that also enabled an Amazon unit to le...
Santa Clara industrial building at 2305 Mission Blvd as of 2019
Posted in Amazon 2305 Mission College Blvd

Santa Clara industrial building at 2305 Mission Blvd. IPI Partners acquired the building in December 2019 in Santa Clara, part of an intricate series of deals that also enabled an Amazon unit to lease the property and gain an option to potentially buy the site at some point.

Source: Google Maps

AWS is proposing to build 1.75 million sqft of data centers on the 100 acre lot
Posted in Amazon 25020 Willard Road

Drone shot of Amazon's Haymarket data center campus
Posted in Amazon IAD-55

Map of Amazon, Google, and Facebook in New Albany
Posted in Amazon New Albany

Plans for T5's facility in the Clonshaugh Business Park
Posted in Amazon Clonshaugh Park

Rendering of the 1st building
Posted in Amazon Clonshaugh Park

A rendering of the 2nd proposed AWS Meath data center
Posted in Amazon Drogheda I
Source: MCA Architects

Amazon boundries for the Tnuvot project
Posted in Amazon Israel: Tnuvot
Source: Dan Harel

Proposed AWS layout at the former Didcot Power Station
Posted in Amazon Didcot

An aerial rendering of the AWS Warrenton Data Center
Posted in Amazon: Warrenton, VA
Source: Bohler Engineering