Manitoba Hydro Telecom Data Centre

360 Portage Ave

Operated by: Manitoba Hydro Telecom

The site was commissioned in 2010.

Power:


  • 360 Portage Ave. is a LEED® Platinum certified facility
  • 100% uptime since operations began in 2010
  • Two physically diverse substations with an auto switch for transitioning
  • Step down transformer at 360 Portage Ave.
  • Diesel Generator with three 1170 litre tanks in diverse locations
  • UPS to handle transition to generator
  • Manitoba Hydro is a renewable energy source, with diverse hydro-electric generating stations in Manitoba.

Cooling:


  • Four standalone Leibert AC units in the space; two 7.5 ton units & two 10 ton units
  • AC is vented to a separate cooling tower system on the roof
  • AC units are serviced monthly with no interruptions to the cooling system
  • The Leiberts are shut down individually when serviced
  • The air is re-circulated in the building and filtered with Merv 8 Filters on the Leiberts

Map and Nearby Locations:

360 Portage Ave
Click Map to begin Search

Sites within 15 miles of Manitoba Hydro Telecom Data Centre

Show SqM
Distance Site About
0.18 miles Les.net YWG2
0.50 miles TeraGo Winnipeg
0.50 miles Exchange Group - Global Server Center
4.85 miles Equinix Winnipeg WI1
The site was formerly known as "Q9 Winnipeg" which was acquired by Equinix from Bell Canada in 2020.

Manitoba Hydro Telecom Data Centre Data Center Photos

Operating Company

Manitoba Hydro Telecom
1 Facilities Owned
1 Markets Served
0 Megawatts
View Company