0.12 miles
|
QTS Hillsboro 2
|
QTS Hillsboro-2 is the second data center building of its Hillsboro campus. The site is located at 4755 NE Huffman St, Hillsboro, OR.
|
0.20 miles
|
QTS Hillsboro 3
|
QTS Hillsboro-3 is the third data center building of its Hillsboro campus. The site is located at 4425 NE Huffman St, Hillsboro, OR 97124
|
0.26 miles
|
QTS Hillsboro 4
|
QTS Hillsboro-4 is the fourth data center building of its Hillsboro campus. The site is located at 4327 NE Huffman St, Hillsboro, OR.
|
0.36 miles
|
QTS Hillsboro 5
|
QTS Hillsboro-5 is the fifth data center building of its Hillsboro campus. The site is located at 4113 NE Huffman St, Hillsboro, OR.
|
0.49 miles
|
Flexential Portland - Hillsboro 3
|
The company began construction of the facility in October 2020 and finished in 2022. The facility totals 358,000 square feet (33,300 sq m) and supports 36MW consisting of four separate halls, each with 60,000 sq ft (5,500 sq m) and 9MW capacity.
|
0.53 miles
|
Flexential Hillsboro 2
|
The site houses the U.S. cable landing station for the Hawaiki submarine cable, which delivers “low-latency” connection between the continental U.S., Hawaii, Australia, New Zealand and American Samoa.
|
0.58 miles
|
CoreWeave: Hillsboro, OR
|
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
|
0.58 miles
|
Flexential: Hillsboro 5
|
Flexential is building a new data center facility at 4975 NE Starr Blvd at it's HIllsboro 4 campus.
|
0.58 miles
|
STACK Portland POR03
|
STACK Infrastructure is constructing a new data center facility named POR03A at 4735 NE Starr Blvd, Hillsboro, OR. The data center will boast a substantial footprint of 180000 square feet.
|
0.62 miles
|
T5 Portland
|
|
0.63 miles
|
Flexential Hillsboro 4
|
Flexential's Hillsboro 4 project is located at 4915 NE Starr Blvd, adjacent to its Hillsboro 3 facility. Hillsboro 4 adds 138,000 sq. ft. and 18 MW to Flexential’s regional footprint.
|
0.65 miles
|
Stack: POR03B
|
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building B, in Hillsboro with a substantial footprint of 180000 square feet.
|
0.66 miles
|
Stack: PORT03 Future Expansion
|
STACK Infrastructure is planning to extend their data center campus PORT03 at 4735 NE Starr Blvd, in Hillsboro
|
0.66 miles
|
STACK: POR1
|
|
0.68 miles
|
Adobe Hillsboro
|
|
0.72 miles
|
Stack: POR03C
|
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building C, in Hillsboro with a substantial footprint of 180000 square feet.
|
0.74 miles
|
EdgeConneX POR03
|
EdgeConneX is developing a 21MW POR03 facility in its Portland campus that will be available in 2025.
|
0.77 miles
|
Digital Realty: PDX12
|
Digital Realty PDX12 Data Center is located at 5870 Northeast Schaaf Street, Hillsboro, OR 97124, USA. The data has a Total building size of 560,000 sqft (52,025 sqm). It has access to 32 MW of power with N+1 UPS redundancy
|
0.79 miles
|
NTT Hilsboro HI1
|
NTT Hillsboro facility is located in the heart of the Pacific Northwest technology hub. Hillsboro HI1, the first of five data centers on 126MW campus, offers 36MW of critical IT load, 138,000ft² of data floor space, and is Cleaner Air Oregon certified.
|
0.81 miles
|
EdgeConneX Portland
|
|
0.85 miles
|
Digital Realty PDX11
|
Digital Realty’s Oregon data center, referred to as PDX11, is a 553,000 square-foot, two-story LEED-Silver certified data center that was designed and constructed to be highly energy efficient and water-wise.
|
0.88 miles
|
NTT HI2
|
NTT Data is building a second data center at its Hillsboro Campus. Lease Crutcher Lewis Builders is constructing the new two-story, 420,000-square-foot data center with eleven 6MW data vaults for a total 66MW capacity.
|
1.09 miles
|
Aligned: PDX-02
|
|
1.13 miles
|
Aligned Hillsboro PDX-01
|
Aligned's Hillsboro campus spreads across 27.2 acres of land at the intersection of NE 30th Ave. and NE Evergreen Rd. The initial data center facility, dubbed PDX-01, is anticipated to deliver 72MW of critical capacity.
|
1.30 miles
|
EdgeConnex POR2
|
EdgeConnex POR-2 data center is located at 6297 NE Evergreen Pkwy, Hillsboro, OR.
|
1.65 miles
|
STACK Portland POR02
|
|
1.68 miles
|
Opus Interactive Hillsboro
|
Opus Interactive's Hillsboro data center is Located at 21515 NW Evergreen Parkway, Hillsboro, OR. The Facility currently offers 345,000 sq. ft. of space with 24 MW critical capacity, with expansion capacity
|
1.84 miles
|
Tata Hillsboro
|
|
1.89 miles
|
Intel Hillsboro, HF2-DC201
|
|
1.90 miles
|
Digital Realty PDX10
|
Digital Realty's Hillsboro PDX-10 site was originally constructed by Dupont Fabros before being acquired in Sept 2017 by Digital Realty Trust in a $7.6 Billion 12 datacenter deal.
|
1.90 miles
|
Flexential Hillsboro 1
|
The Hillsboro sites are a former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
|
2.21 miles
|
OVH Hillsboro, Oregon: HIL-1
|
|
6.78 miles
|
Lumen Portland 3
|
The site is a former tw telecom operated facility.
|
8.10 miles
|
Rowan: Meriwether, OR
|
Rowan Data Centers has announced plans for a campus in Forest Grove, Portland, OR. Preliminary plans for the Project Meriwether development call for 150 MW of capacity.
|
8.14 miles
|
Crane: Portland, OR
|
Crane Data Centers Inc. is planning a 100+MW data center campus in the Forest Grove area, around eight miles from Hillsboro, Oregon.
|
9.30 miles
|
Digital Fortress: PTL 2
|
Digital Fortress PTL2 Data center is located at 9705 SW Sunshine Ct, Beaverton, OR. The 3,500 sq. ft. facility has 1,704 sq. ft. of white space with 1.2 MW of available power on an N+1 concurrently maintainable configuration.
|
9.32 miles
|
Lunavi Portland
|
|
9.33 miles
|
Atmosera DC1 DC2
|
|
9.33 miles
|
Digital Fortress: PTL 3
|
Digital Fortress PTL-3 data center is located at 9610 SW Sunshine Ct, Beaverton, OR. The 6,700 sq. ft. facility has 3,326 sq.ft. of white space with 1.5 MW of available power on an N+1 concurrently maintainable configuration.
|
9.92 miles
|
XO: Beaverton
|
|
11.55 miles
|
SpireTech
|
|
11.88 miles
|
Lumen Portland I
|
Lumen Portland I is located at 1335 Northwest Northrup Street, Portland, OR, USA
|
11.95 miles
|
H5 Portland
|
vXchnge acquired the site from SunGard in 2015.
In 2017 the NWAX peering Exchange deployed to vXchnge Portland.
|
12.07 miles
|
Opus Interactive Portland
|
|
12.07 miles
|
Tata Portland (Brewery Block)
|
The Portland Brewery Blocks data center was purposely built by it’s previous owner, Tycom to serve as an endpoint for it’s high-capacity, undersea fiber cable linking the US with Asia.
|
12.18 miles
|
Atmosera DC3
|
|
12.18 miles
|
Digital Fortress: Portland
|
Digital Fortress Portland Data Center PTL is located at Downtown Portland, Oregon. The 10,700 sq. ft. facility has 6.700 sq. ft. of raised floor data center space with 2.1 MW of available power on an N+1 concurrently maintainable configuration.
|
12.23 miles
|
Pittock Internet Exchange
|
The Pittock building is Portland's carrier hotel, which has the second greatest density of networks and carriers in the Pacific Northwest (2nd to the Westin Building in Seattle.)
|
12.31 miles
|
Lumen Portland 2
|
Lumen Portland 2 data center is Located in the Union Bank Building Portland, OR.
|
12.37 miles
|
LightPoint Portland
|
|