Google: Eagle Mountain, Utah

Street Address
Interested in this information? Contact us

Operated by:

Google has purchased 300 acres of land for a future campus in Eagle Mountain. The tech giant acquired the acreage from a private buyer for an undisclosed sum. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center. Negotiations with Google ended in a written promise that the company will spend $1.2 billion in the area in the next 30 years.

Map and Nearby Locations:

This Facility
Click Map to begin Search

Sites within 15 miles of Google: Eagle Mountain, Utah

Show SqM
Distance Site About
0.47 miles Facebook Eagle Mountain Utah
The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
3.34 miles Tract: Eagle Mountain, Utah
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
11.75 miles NSA Utah Data Center
14.32 miles C7 Lindon (Timpanogos)
15.42 miles Flexential Salt Lake (Lindon)
15.71 miles DataBank SLC3
15.76 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
15.76 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
15.77 miles DataBank SLC6
15.84 miles DataBank SLC4
15.85 miles DataBank SLC5
16.28 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site
17.51 miles Fibernet ORM1
17.66 miles Voonami Orem SLC1

Google: Eagle Mountain, Utah Data Center Photos

Operating Company

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

51 Facilities Owned
35 Markets Served
2242.8 Megawatts
View Company

News

Read More News