The plan for a massive data center complex has been approved by Prince William County's board of supervisors. This complex is set to be built in a mostly rural area near Interstate 66 and a Civil War battlefield site.

  • Proposed by QTS and Compass Datacenters the complex will see over 22M SF of data center space built across more than 2,000 acres in the largely rural region of Northern Virginia.
  • The Digital Gateway would total 34 data centers with a capacity exceeding 1.7 gigawatts. That is nearly as much as has been built or is under construction in neighboring Loudoun County, the largest data center market in the world.

Map and Nearby Locations:

Pageland Ln & VA-234
Click Map to begin Search

Sites within 15 miles of QTS: Prince William Digital Gateway Campus

Show SqM
Distance Site About
1.43 miles Compass: Prince William Digital Gateway Campus
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
3.39 miles Corscale: Gainesville Crossing
3.42 miles CorScale: Gainesville Building 2
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
3.61 miles AWS: 7151 Century Park Campus
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
3.80 miles AWS: 7350 Century Park
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
3.85 miles Microsoft : Gainesville 2
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
3.86 miles Microsoft: Gainesville, VA
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
3.93 miles Amazon IAD-59
3.97 miles Microsoft: Jacksonville Road
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
4.01 miles Amazon IAD-52
4.07 miles NTT Gainesville VA Campus
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
4.09 miles Amazon IAD14
4.12 miles AOL: 7777 Infantry Ridge
4.14 miles Amazon IAD24
4.16 miles Amazon IAD11
4.16 miles Amazon IAD7
4.17 miles Amazon 7500 Bethlehem
4.22 miles Amazon: 5945 Wellington
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
4.25 miles Equinix Manassas DC14
4.81 miles Amazon IAD-73
4.83 miles Amazon: 8190 Bethlehem
4.84 miles Amazon Bethlehem Technology Park DC20
4.86 miles Amazon IAD-74
4.87 miles Yondr Bristow Campus
4.89 miles Amazon Bethlehem Technology Park DC19
4.91 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
4.97 miles Amazon IAD-55
4.98 miles Amazon Bethlehem Technology Park DC18
4.99 miles Iron Mountain VA-2
5.02 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
5.14 miles Amazon: 15455 John Marshall
5.18 miles Iron Mountain: VA-7
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
5.20 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
5.20 miles Opus Interactive Manassas
5.20 miles Amazon 15465 John Marshall
5.21 miles 8217 Linton Hall (VA4) Digital Realty
5.32 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
5.60 miles AWS: 8401 Vulcan Lane Campus
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
6.02 miles AWS: 8501 Vulcan Ln
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
6.14 miles Amazon IAD61
6.19 miles Amazon Prediction Lane
6.21 miles Amazon IAD-63
6.36 miles Amazon 25020 Willard Road
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
6.48 miles 9020 Freedom Center
6.53 miles 9040 Freedom Center
6.53 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
6.59 miles Amazon 25410 Sutton Bay
6.61 miles Amazon 25430 Sutton Bay IAD150
6.64 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
6.66 miles IBM Softlayer Chantilly WDC01
6.70 miles Stack: Northern Virginia NVA05
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
6.73 miles Amazon 25420 Sutton Bay
6.80 miles Amazon Willard Road (Land)
6.81 miles Amazon 41992 John Mosby Highway
6.81 miles PowerHouse Arcola
6.83 miles Penzance: Chantilly Premier
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
6.83 miles Google: Arcola 2
6.88 miles QTS Manassas DC5
6.90 miles Amazon IAD22
6.95 miles Amazon IAD1
6.99 miles Microsoft IAD11
7.01 miles QTS Manassas DC1
7.04 miles Amazon IAD9
7.10 miles Google Dulles Arcola Center
7.13 miles Stack: NVA02D
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
7.14 miles Yondr Arcola, VA
The campus's first building was delivered in late 2023.
7.15 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
7.15 miles Amazon IAD-77
7.15 miles VAZATA Northern Virginia (NoVa One)
7.15 miles Evoswitch USA WDC 1
7.19 miles Stack: NVA02E
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
7.19 miles QTS 10680 University Blvd
7.23 miles Microsoft Aldie
7.28 miles Stack: NVA02C
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
7.34 miles Stack: NVA02B
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
7.38 miles Amazon Fadeley II
7.41 miles Amazon: 11200 Thomasson Barn
7.41 miles Amazon Fadeley III
7.42 miles Amazon: 11150 Thomasson Barn
7.42 miles Stack: Northern Virginia, NVA02
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
7.50 miles Amazon Fadeley I
7.72 miles AWS: Nokesville Road Campus
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
8.28 miles AWS: 10453 Wakeman Drive
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
8.28 miles CyrusOne Sterling IX
8.31 miles AWS 10261 Tanner
8.36 miles AWS IAD 101
8.43 miles AWS 10281 Tanner Way
8.46 miles AWS IAD 100
8.80 miles Digital Realty Dulles
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
9.06 miles OVH US East Vint Hill
9.07 miles Amazon 13600 EDS Drive
9.32 miles CloudHQ MCC2
9.52 miles InfoRelay Herndon
9.61 miles CloudHQ Manassas MCC1
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
9.78 miles CloudHQ MCC3
11.30 miles Cyxtera Sterling DC7
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
11.39 miles Import Plz, Ashburn
11.40 miles 44351 Import Plz
11.46 miles QTS Ashburn-Shellhorn
11.51 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
11.55 miles QTS Ashburn-Shellhorn DC2
11.56 miles 43831 Devin Shafron (Bldg C)
11.56 miles 43791 Devin Shafron (Bldg D)
11.56 miles Amazon IAD-54
11.57 miles 43881 Devin Shafron (Bldg B)
11.57 miles 43940 Digital Loudoun Plaza (Bldg G)
11.57 miles Amazon IAD-67
11.58 miles Digital Realty Loudoun Ashburn Campus
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
11.64 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
11.64 miles 43915 Devin Shafron (Bldg A)
11.65 miles Amazon IAD12
11.65 miles 43780 Digital Loudoun Plaza (Bldg H)
11.65 miles 44060 Digital Loudoun Plaza (Bldg K)
11.65 miles 44100 Digital Loudoun Plaza (Bldg J)
11.67 miles Amazon IAD-58
11.68 miles 43830 Devin Shafron (Bldg F)
11.70 miles 43790 Devin Shafron (Bldg E)
11.73 miles Amazon IAD16
11.74 miles Amazon IAD-57
11.79 miles Amazon IAD15
11.79 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
11.82 miles QTS Ashburn Lockridge
11.83 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
11.88 miles Amazon IAD76
11.90 miles AWS: 22945 International Dr
11.92 miles Stack: Northern Virginia NVA04
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
11.94 miles Amazon IAD-88
11.96 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
11.98 miles Amazon 45111 Loudoun Downs
12.02 miles AWS: 22868 International Dr
12.06 miles Amazon IAD-56
12.07 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
12.10 miles Cyxtera IAD2-B
12.11 miles CyrusOne Northern Virginia Sterling IV
12.14 miles Cyxtera IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
12.14 miles Amazon IAD-51
12.23 miles 44372 Round Table: Digital Realty
12.24 miles AWS: 22900 Platform Plz
12.27 miles Digital Realty: IAD43
12.27 miles Aligned IAD02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
12.29 miles 44274 Round Table (Bldg L)
12.29 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
12.37 miles Amazon 22420 Kipper
12.39 miles Amazon 22370 Kipper
12.39 miles Equinix DC13
12.42 miles Sabey Intergate.Ashburn (Building A)
12.44 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
12.47 miles Databank Ashburn IAD1
In December 2020, Databank acquired the site from Zayo.
12.49 miles FastServ Ashburn
12.53 miles CloudHQ Ashburn Campus
12.53 miles 44751 Round Table (Bldg P)
12.53 miles Aligned Ashburn
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
12.53 miles Digital Realty: Broderick Drive
12.55 miles Vantage VA12
12.56 miles Sabey Intergate.Ashburn
Intergate.Ashburn is a purpose-built data center campus on 38 acres
12.56 miles Sentinel Ashburn
12.58 miles CoreSite Reston VA3
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
12.59 miles PowerHouse Pacific
12.62 miles DataBank Ashburn IAD3
12.65 miles Vantage Ashburn Campus
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
12.66 miles 21744 Sir Timothy Drive (ACC10)
12.67 miles Vantage VA2 Campus
12.67 miles CloudHQ LC2
12.70 miles 21745 Sir Timothy (ACC9) Digital Realty
12.71 miles Vantage VA13
12.73 miles AWS: 45950 Pathfinder Plz
12.74 miles 45900 Pathfinder Plz
12.75 miles Vantage VA11
12.75 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
12.76 miles Cogent: 510 Huntmar
12.82 miles NTT VA5
12.83 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
12.83 miles AWS: 45930 Pathfinder Plz
12.84 miles Lumen Herndon 3
12.85 miles Equinix DC97
12.85 miles Lumen Herndon 1
12.85 miles Equinix DC21
12.92 miles NTT Ashburn Campus
12.92 miles 21780 Filigree: Digital Realty
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
12.92 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
12.92 miles Equinix Ashburn DC5
12.93 miles Equinix Ashburn DC6
12.93 miles Equinix Ashburn DC11
12.94 miles Equinix Ashburn DC4
12.95 miles Equinix Ashburn DC1
12.95 miles CoreSite Reston Campus VA1 VA2
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
12.95 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
12.96 miles NTT VA4
12.96 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
12.96 miles VPLS IAD
13.00 miles Equinix Ashburn Campus
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
13.01 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
13.02 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
13.02 miles ANEXIO ACC5
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
13.02 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
13.12 miles ANEXIO Ashburn IAD4
13.12 miles 44521 Hastings (ACC2) Digital Realty
13.14 miles 44521 Hastings (ACC4) Digital Realty
13.19 miles 44520 Hastings (ACC3) Digital Realty
13.20 miles Rackspace Ashburn IAD3
13.20 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
13.27 miles 44490 Chilum Place: Digital Realty
13.30 miles Cologix Ashburn ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
13.30 miles 44470 Chillum - Digital Realty
13.31 miles ServerCentral Ashburn DC3
13.31 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
13.37 miles PowerHouse ABX1
13.40 miles Lumen Ashburn
13.47 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
13.47 miles 21710 Charles View
13.48 miles ANEXIO VA1
13.48 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
13.49 miles Evoque Ashburn WDC1
24x7x365 on-site staff
13.57 miles NTT VA2
13.57 miles Equinix DC15
13.64 miles Compass Loudoun County
13.64 miles 21641 Charles View
13.64 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
13.78 miles Amazon 44862 Interconnection Plaza
13.80 miles Amazon IAD71
13.80 miles Amazon IAD60
13.82 miles Amazon 45305 Severn
13.82 miles Amazon 44858 Interconnection Plaza
13.83 miles Amazon IAD50
13.86 miles Amazon 45259 Severn
13.86 miles Amazon 44854 Interconnection
13.94 miles Amazon IAD32
13.96 miles InfoRelay Reston
14.02 miles Amazon IAD10
14.13 miles CyrusOne Northern Virginia Sterling V
14.20 miles Google Leesburg Stonewall Park
14.39 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
14.44 miles AWS: 20945 Loudoun County Pkwy
14.48 miles AWS: 20935 Loudoun County Pkwy
14.49 miles COPT: 45761 Maries Rd
14.52 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
14.52 miles VPLS DC1
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
14.53 miles COPT: 45751 Maries Rd
14.53 miles CyrusOne Sterling VIII
14.54 miles TA Realty: Leesburg
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
14.54 miles EdgeCore Ashburn
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
14.61 miles ANEXIO Reston
14.61 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
14.63 miles Cyxtera Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
14.65 miles Cyxtera Sterling DC2
14.75 miles CyrusOne Northern Virginia Sterling I, II, III
14.76 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
14.76 miles Cyxtera Sterling DC4
14.79 miles Amazon IAD-69
15.43 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
15.70 miles Microsoft Leesburg 1A
16.19 miles Stack: Northern Virginia, NVA06
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
16.36 miles Vantage VA3 Campus
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
17.49 miles XO Fairfax
18.50 miles Equinix Vienna DC8
18.76 miles Cogent Vienna
18.85 miles 8100 Boone - Digital Realty
19.05 miles Equinix Vienna DC7
19.09 miles Element Critical VA1
19.61 miles DataBank McLean IAD2
19.67 miles Lumen McLean 1

QTS: Prince William Digital Gateway Campus Data Center Photos


QTS Prince William Digital Gateway Campus context map
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Company History:


  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
  • 2003: Company acquired first data center in Overland Park, KS
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2010 Acquired their Richmond facility
  • 2013: When public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2014 Expanded with Chicago and Princeton data centers
  • May 2015: QTS acquires Carpathis Hosting for $326 million. [1] The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities. [2] [3]

Headquarters:


QTS maintains three different operational headquarters. The corporate headquarters are in Overland Park, KS. The operational headquarters are in Suwanee, GA. Carpathia headquarters have remained in Dulles, VA to better serve government clients.

References:


1. PR Newswire May 6, 2015
2. The Whir article July 5, 2012
3. The Whir article Feb 28, 2011

50 Facilities Owned
22 Markets Served
1046.0 Megawatts
View Company

News

Read More News